top of page


Screen Shot 2016-04-05 at 11.58.11 AM (1)
Villa Constance a premier Condo spot in Santa BARBARA. COLE CONSTRUCTION HIRED BY BARTLIEN PROPERTY MANAGEMENT TO SOLVE WATER INTRUSION PROBLEMS. BASEMENT AND SURFACE DRAINS WERE INSTALLED THROUGHOUT.

IMG_3581
Surface drains carried surface water away from units, solving the problems of high moisture.

IMG_3572
Describe your image.

IMG_3577
Describe your image.

IMG_3579
Patio replaced after installing new 2 story footing and retaining wall under these units.

IMG_3580
Describe your image.

IMG_3578
Describe your image.
bottom of page